Aid of character restricted to four equipment. Promoted by a private company.
Allotment acquired placed tangentially on the Valencia-Alacant highway.
Approximate orientation east-west. An outline coming from the headquarters Ford-Sapin was given to us.
Some already made floors were given us. Exits of a flow chart of routine office. After studying it stopped we opted to restructure it, articulated the several activities and grouped them. That is to improve it. With the determination of playing strongly. And in favour of the next customer. Not the one of the headquarters in Madrid. The conclusion, of everything, was to add a building for him, to real cost price, with architectural value.
Idea force 1: Creating a point of attention and attraction from the highway. Propagandistic and commercial factor. In the middle of a string of industries placed in shape parallel on the highway. The answer, in the face of the shortage of forehead was necessary that it would be strong and attractive.
Idea force 2: Rethinking all the established items and sorting it according to the whole of the allotment. Implementing three general axes according to the itineraries of the vehicles for the inland of the building. Modulation: On the basis of a model grill of 7.20 x (3.60 / 5.40) m.
Of an outline in perspective at hand raised, it specifies and wraps several parallelepipeds that overlapped among them, all the interactive functions is accommodated:
Semi basement floor: chutes of descent for garage (120 posts) and stock for 154 vehicles. Surrounding opening in the form of English semi courtyard. Assembles cars platform.
Ground floor: Two parallelepipeds: 1. Pre ITV, mechanical Workshop. 2. Warehouse, Workshop-cameras of plating and painting. Warehouse. A rectangular central space accommodates exhibitor-reception-offices. Space of transversal traffic between workshop and warehouse.
Upper floor: former part seen donor the exhibitor on the highway. A scale open metallic it turns up in the beautiful half a one. Behind the offices of management, direction, boardroom, etc Behind a longitudinal segment, segregated from the former one he accommodates diverse rooms for the staff.
Two kernels of scale are the nodules of vertical communication. Besides the platform the assembles cars open and of glass. Visible from the requirement. Dynamic element.
We pass a budget of 175.226.200 ptes. The company it wanted one that him adjust at 102 million pesetas. We came off the seconds of the ranking. It won an equipment of engineers that the outline sent from Madrid had repeated.
Three years after executing the engineered project, the Valencian promoting company, the dealer had to be sold.